On May 10, 2016 12:16 PM EDT Tara Whiting changed a meeting of Conservation Commission as follows:
WEST TISBURY CONSERVATION COMMISSION AGENDA May 10, 2016 5:00 PM • Location: Second floor of Town Hall • Call to Order • Approval of Minutes: • Hearings/Meetings: Continued Public Hearings: 5:10 PM/Map 7 Lot 13/SE79-365: public hearing under the requirements of G.L. Ch.131 § 40, as amended and the West Tisbury Wetlands Protection Bylaw and regulations to consider a Notice of Intent filed by Schofield, Barbini & Hoehn for a project to relocate an existing shed and construct a single-family dwelling, and to perform associated site work including underground utilities and site restoration in the Buffer Zone. The project is located at 367 Lambert’s Cove Road, Assessors owned by Glenn O. Medowski, Trustee of the Glenn O. Medowski Revocable Trust. 5:25 PM/Map 11 lots 39 and 109.1/SE 79-367: a public hearing under the requirements of G.L. Ch.131 § 40, as amended and the West Tisbury Wetlands Protection Bylaw and regulations to consider a Notice of Intent filed by the Martha’s Vineyard Land Bank for a project to expand the Manaquayak Preserve by constructing 365 ft. of new trail and installing an elevated boardwalk and viewing platform in an isolated wetland for access to Rainwater Pond. The project is located at 40 Pepperbush Way owned by the Martha’s Vineyard Land Bank and Nation Lots Realty Trust respectively. See 310 CMR 10.53 (j) for boardwalk and platform; Bylaw section XVII C. 1 and 6. Paths for public access on conservation property less than 3 ft. wide in the Buffer Zone are exempt under 310 CMR 10. 02 (b) 2 a. Paths in the no-disturbance zone under the bylaw require a waiver. See Sections III N and IV. Applicant has requested a waiver. See Section VIII for land subject to flooding. New Public Hearings: 5:40 PM/ Map 7 Lot 69: a public hearing under the requirements of the West Tisbury Wetlands Protection Bylaw and regulations to consider a Notice of Intent filed by Vineyard Land Surveying & Engineering, Inc., for a project to construct a driveway within 33 feet of an isolated wetland and to perform associated site work. The project location is 52 Longview Road, owned by Michael A. Smith. 6:00 PM/ Map 14 Lot 2/SE 79-368: a public hearing under the requirements of G.L. Ch.131 § 40, as amended and the West Tisbury Wetlands Protection Bylaw and regulations to consider a Notice of Intent filed by Vineyard Land Surveying & Engineering, Inc., for a project to construct an addition to the existing dwelling, construct a new guest house, install a septic system, well and waterline, reconfigure the existing driveway and landscaping and maintain the existing view channels.. The project location is 38 Forest Road. • New Business: Synthetic Turf Proposal/ MV High School/ Prudy Time will be reserved for any topics that the chair did not reasonably anticipate. • Old Business Map 34 Lot 10.1/ SE79-366/ Special Conditions/Review Town Properties/BOS draft of Rules and Regulations Brandy Brow Bylaw revisions • Calendar May 19- site visits May 24– next scheduled meeting June 4-7- office will be closed for vacation • Administrative Map 11 Lot 41.1 /101 Pepperbush/Administrative Review/dead tree removal Correspondence: In: Map 11 Lots 39 and 109. 2 DEP file no letter Out: Map 7 Lot 64/ Thank you letter OB Solar Letterto
WEST TISBURY CONSERVATION COMMISSION AGENDA May 10, 2016 5:00 PM • Location: Second floor of Town Hall • Call to Order • Approval of Minutes: • Hearings/Meetings: Continued Public Hearings: 5:10 PM/Map 7 Lot 13/SE79-365: public hearing under the requirements of G.L. Ch.131 § 40, as amended and the West Tisbury Wetlands Protection Bylaw and regulations to consider a Notice of Intent filed by Schofield, Barbini & Hoehn for a project to relocate an existing shed and construct a single-family dwelling, and to perform associated site work including underground utilities and site restoration in the Buffer Zone. The project is located at 367 Lambert’s Cove Road, Assessors owned by Glenn O. Medowski, Trustee of the Glenn O. Medowski Revocable Trust. 5:25 PM/Map 11 lots 39 and 109.1/SE 79-367: a public hearing under the requirements of G.L. Ch.131 § 40, as amended and the West Tisbury Wetlands Protection Bylaw and regulations to consider a Notice of Intent filed by the Martha’s Vineyard Land Bank for a project to expand the Manaquayak Preserve by constructing 365 ft. of new trail and installing an elevated boardwalk and viewing platform in an isolated wetland for access to Rainwater Pond. The project is located at 40 Pepperbush Way owned by the Martha’s Vineyard Land Bank and Nation Lots Realty Trust respectively. See 310 CMR 10.53 (j) for boardwalk and platform; Bylaw section XVII C. 1 and 6. Paths for public access on conservation property less than 3 ft. wide in the Buffer Zone are exempt under 310 CMR 10. 02 (b) 2 a. Paths in the no-disturbance zone under the bylaw require a waiver. See Sections III N and IV. Applicant has requested a waiver. See Section VIII for land subject to flooding. New Public Hearings: 5:40 PM/ Map 7 Lot 69: a public hearing under the requirements of the West Tisbury Wetlands Protection Bylaw and regulations to consider a Notice of Intent filed by Vineyard Land Surveying & Engineering, Inc., for a project to construct a driveway within 33 feet of an isolated wetland and to perform associated site work. The project location is 52 Longview Road, owned by Michael A. Smith. 6:00 PM/ Map 14 Lot 2/SE 79-368: a public hearing under the requirements of G.L. Ch.131 § 40, as amended and the West Tisbury Wetlands Protection Bylaw and regulations to consider a Notice of Intent filed by Vineyard Land Surveying & Engineering, Inc., for a project to construct an addition to the existing dwelling, construct a new guest house, install a septic system, well and waterline, reconfigure the existing driveway and landscaping and maintain the existing view channels.. The project location is 38 Forest Road. • New Business: Synthetic Turf Proposal/ MV High School/ Prudy Time will be reserved for any topics that the chair did not reasonably anticipate. • Old Business Map 1 Lot 50/SE79-358/Landscaping/restoration Map 34 Lot 10.1/ SE79-366/ Special Conditions/Review Town Properties/BOS draft of Rules and Regulations Brandy Brow Bylaw revisions • Calendar May 19- site visits May 24– next scheduled meeting June 4-7- office will be closed for vacation • Administrative Map 11 Lot 41.1 /101 Pepperbush/Administrative Review/dead tree removal Map 36 Lot 43/SE79-58 and 160/Certificates of Compliance Correspondence: In: Map 11 Lots 39 and 109. 2 DEP file no letter Out: Map 7 Lot 64/ Thank you letter OB Solar Letter
So that the meeting notice now reads:
Town: | West Tisbury, MA |
Board: | Conservation Commission |
Time: | Tuesday May 10, 2016 5:00 PM EDT |
Location: | West Tisbury Town Hall, 2nd Floor |
Agenda: | WEST TISBURY CONSERVATION COMMISSION AGENDA May 10, 2016 5:00 PM • Location: Second floor of Town Hall • Call to Order • Approval of Minutes: • Hearings/Meetings: Continued Public Hearings: 5:10 PM/Map 7 Lot 13/SE79-365: public hearing under the requirements of G.L. Ch.131 § 40, as amended and the West Tisbury Wetlands Protection Bylaw and regulations to consider a Notice of Intent filed by Schofield, Barbini & Hoehn for a project to relocate an existing shed and construct a single-family dwelling, and to perform associated site work including underground utilities and site restoration in the Buffer Zone. The project is located at 367 Lambert’s Cove Road, Assessors owned by Glenn O. Medowski, Trustee of the Glenn O. Medowski Revocable Trust. 5:25 PM/Map 11 lots 39 and 109.1/SE 79-367: a public hearing under the requirements of G.L. Ch.131 § 40, as amended and the West Tisbury Wetlands Protection Bylaw and regulations to consider a Notice of Intent filed by the Martha’s Vineyard Land Bank for a project to expand the Manaquayak Preserve by constructing 365 ft. of new trail and installing an elevated boardwalk and viewing platform in an isolated wetland for access to Rainwater Pond. The project is located at 40 Pepperbush Way owned by the Martha’s Vineyard Land Bank and Nation Lots Realty Trust respectively. See 310 CMR 10.53 (j) for boardwalk and platform; Bylaw section XVII C. 1 and 6. Paths for public access on conservation property less than 3 ft. wide in the Buffer Zone are exempt under 310 CMR 10. 02 (b) 2 a. Paths in the no-disturbance zone under the bylaw require a waiver. See Sections III N and IV. Applicant has requested a waiver. See Section VIII for land subject to flooding. New Public Hearings: 5:40 PM/ Map 7 Lot 69: a public hearing under the requirements of the West Tisbury Wetlands Protection Bylaw and regulations to consider a Notice of Intent filed by Vineyard Land Surveying & Engineering, Inc., for a project to construct a driveway within 33 feet of an isolated wetland and to perform associated site work. The project location is 52 Longview Road, owned by Michael A. Smith. 6:00 PM/ Map 14 Lot 2/SE 79-368: a public hearing under the requirements of G.L. Ch.131 § 40, as amended and the West Tisbury Wetlands Protection Bylaw and regulations to consider a Notice of Intent filed by Vineyard Land Surveying & Engineering, Inc., for a project to construct an addition to the existing dwelling, construct a new guest house, install a septic system, well and waterline, reconfigure the existing driveway and landscaping and maintain the existing view channels.. The project location is 38 Forest Road. • New Business: Synthetic Turf Proposal/ MV High School/ Prudy Time will be reserved for any topics that the chair did not reasonably anticipate. • Old Business Map 1 Lot 50/SE79-358/Landscaping/restoration Map 34 Lot 10.1/ SE79-366/ Special Conditions/Review Town Properties/BOS draft of Rules and Regulations Brandy Brow Bylaw revisions • Calendar May 19- site visits May 24– next scheduled meeting June 4-7- office will be closed for vacation • Administrative Map 11 Lot 41.1 /101 Pepperbush/Administrative Review/dead tree removal Map 36 Lot 43/SE79-58 and 160/Certificates of Compliance Correspondence: In: Map 11 Lots 39 and 109. 2 DEP file no letter Out: Map 7 Lot 64/ Thank you letter OB Solar Letter |
Scheduled By: | Tara Whiting |
Posted At: | May 05, 2016 8:46 AM EDT |
Last Modified: | Jun 30, 2016 12:26 PM EDT |